ATEN PN7212 User Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 171
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
Chapter 1. Introduction
3
Operation
Local and Remote power outlet control (On, Off, Power Cycle) by
individual outlets and outlet groups
Outlet group support at the PDU and Daisy-chain levels – the same action
can be performed on a specified group of outlets at the same time
Supports redundant power management via daisy chaining and outlet
groups
On/Off scheduling for individual outlets and outlet groups. Power
management tasks can be scheduled to perform everything on a daily,
weekly, monthly, or user-specified times basis
Supports multiple power on/off control methods – Wake on LAN, System
After AC Back, Kill the Power
Power-on sequencing - users can set the power on sequence and delay time
for each port to allow equipment to be turned on in the proper order
Easy setup and operation via a browser-based user interface
Multibrowser support (IE, Mozilla, Firefox, Chrome, Safari, Opera,
Netscape)
Telnet and SSH access for text menu configuration and outlet level
switching / monitoring
Local console access support
Java GUI AP program provided for non-browser connectivity
RTC support to keep the timer running during times of no power.
Up to 64 user accounts - up to 32 concurrent logins
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 170 171

Comments to this Manuals

No comments